The Village at Totem Lake

  • Location Kirkland, WA
  • Client FF Reality III
  • Home Is Where the Heart Is

    Reviewing new mixed-use construction in Kirkland

A roof over your head. The Village at Totem Lake was undergoing Phase II of its development when it needed elements reviewed before follow-on construction of a seven-story, mixed-use buildings. The 1.4M square feet of space would include a concrete podium structure and parking, wood-framed housing, and a steel-framed movie theater. Because Reid Middleton also performed the previous structural code review of The Village for the first phase, we performed the review for Phase II, starting at the 60% design level to help streamline the permitting when the formal permit submittal was made. Reid Middleton also provided periodic updates to the city to appraise them on the status of the review