Cascade Door Facility

  • Location Arlington, WA
  • Client FSI Architects
  • Owner Cascade Door
  • Knocking at the Door

    New door manufacturing space complete with solid foundation to resist forklift loads.

Opening new doors for Cascade Door. Cascade Door & Hardware needed a new facility for making its doors and hardware products. Reid Middleton provided structural engineering for the design of a 16,300 SF warehouse and office facility. The design used a pre-engineered metal building structure for portions of the building and included a 2,100 square foot office mezzanine that is self-supporting within the walls of the main structure. The design included building foundations, retaining walls, site walls, and a slab-on-grade designed to resist forklift loads.