Reid Middleton | Engineers Planners Surveyors Client Access
  • HOME
  • ABOUT US
    • Firm Profile
    • Our People
  • PROJECTS
    • Alaska
    • Aviation
    • Civic & Municipal
    • Commercial
    • Education
    • Healthcare
    • Industrial
    • Military
    • Transportation
    • Waterfront
  • SERVICES
    • Civil Engineering
    • Structural Engineering
    • Planning
    • Surveying
  • CAREERS
  • NEWS
    • In The News
    • Awards
  • CONTACT
    • Washington
    • Alaska
 
ALASKA
AVIATION
Civic & Municipal
Commercial
Education
Healthcare
Industrial
Military
Transportation
Waterfront

Alaska Railroad Corporation Barge Slip Dolphin Replacement

Seattle, WA

American Seafood Marine Terminal

Dutch Harbor, AK

Boat Haven Marina Renovation, Port of Port Angeles

Port Angeles, WA

Boat Street Marina Renovation, UW

Seattle, WA

Chevron/Texaco Clifton Marine Terminal

Nassau, Bahamas

Coos Bay Covered Moorage

Coos Bay, OR

Drydock 3 Facility Certification Report

Bremerton, WA

Fishermen's Terminal

Seattle, WA

Floating Concrete Structures

Misc. Locations

Hudson Point Marina

Port Townsend, WA

Jones & Sucia Island State Parks

Jones Island, WA
Sucia Island, WA

Lake Terrell Fishing Pier

Bellingham, WA

Leschi Marina Renovations

Seattle, WA

Navy Quay Wall

Bremerton, WA

Pattle Point Trestle Renovation

Bellingham, WA

Pine Lake Park

Sammamish, WA

Port of Seattle Terminal 18 Fender Piling

Seattle, WA

Samsung Heavy Industry Floating Storage Facility

Goeje Island,
South Korea

San Francisco Exploratorium

San Francisco, CA

Seattle Maritime Academy

Seattle, WA

Shilshole Bay Marina

Seattle, WA

Thea Foss Waterway

Tacoma, WA

Transit Protection System Facility

Bangor, WA

 

Port of Seattle Terminal 18 Fender Piling

Seattle, WA

Piling

To rehabilitate the fender systems at the container terminal Berths 4 & 5, Terminal 18, Port of Seattle, Reid Middleton provided engineering services which included field inspection of the damaged timber fender piling and support system to the main wharf structure, construction cost estimate, design of new fender system and development of a mitigation plan. The new design improved performance of the fender system and resolved long-term problems with crack damages. Three different types of new timber fender systems with a steel support structure replace the existing damaged ones. Reid Middleton also provided bid support and construction administration services.

Aviation | Civic & Municipal | Commercial | Education | Healthcare | Industrial | Military | Transportation | Waterfront

| Washington 425-741-3800 | Alaska 907-562-3439