The revision for the Facility Certification Report (FCR) required for the new Dry-Dock 3 Caisson prior to initial operation was tasked to Reid Middleton, providing engineering services that included preparation of an accident prevention plan, caisson inspection, analysis of caisson seat capacity, supervision of underwater inspections, engineering support for the caisson acceptance trial tests, and revision of the facility certification report for the new caisson installed at Dry-Dock #3 at Naval Base Kitsap, Bremerton.