Reid Middleton | Engineers Planners Surveyors Client Access
  • HOME
  • ABOUT US
    • Firm Profile
    • Our People
  • PROJECTS
    • Alaska
    • Aviation
    • Civic & Municipal
    • Commercial
    • Education
    • Healthcare
    • Industrial
    • Military
    • Transportation
    • Waterfront
  • SERVICES
    • Civil Engineering
    • Structural Engineering
    • Planning
    • Surveying
  • CAREERS
  • NEWS
    • In The News
    • Awards
  • CONTACT
    • Washington
    • Alaska
 
ALASKA
AVIATION
Civic & Municipal
Commercial
Education
Healthcare
Industrial
Military
Transportation
Waterfront

Alaska Railroad Corporation Barge Slip Dolphin Replacement

Seattle, WA

American Seafood Marine Terminal

Dutch Harbor, AK

Buse Timber MP

Everett, WA

Chevron/Texaco Clifton Marine Terminal

Nassau, Bahamas

Hampton Lumber Mills Design

Darrington, WA

Port of Seattle Terminal 18 Fender Piling

Seattle, WA

Rinker Materials Permitting

Arlington, WA

Riverside Industrial Park

Everett, WA

Samsung Heavy Industry Floating Storage Facility

Goeje Island,
South Korea

Sawmill Cove Industrial Park MP

Sitka, AK

 

Port of Seattle Terminal 18 Fender Piling

Seattle, WA

Plan Map

To rehabilitate the fender systems at the container terminal Berths 4 & 5, Terminal 18, Port of Seattle, Reid Middleton provided engineering services which included field inspection of the damaged timber fender piling and support system to the main wharf structure, construction cost estimate, design of new fender system and development of a mitigation plan. The new design improved performance of the fender system and resolved long-term problems with crack damages. Three different types of new timber fender systems with a steel support structure replace the existing damaged ones. Reid Middleton also provided bid support and construction administration services.

Aviation | Civic & Municipal | Commercial | Education | Healthcare | Industrial | Military | Transportation | Waterfront

| Washington 425-741-3800 | Alaska 907-562-3439